Swimming Pool Installation Process
1. Contact us
to arrange a free, no obligation site inspection and written quotation.
2. Choose from our vast range of shapes and sizes, then choose one of our great colours to turn your pool into a stunning focal point in your back yard.
3. Contract is signed.
4. Plans are prepared and the Home Owners Warranty Insurance is ordered as per the Home Building Act 1989.
5. Application submitted to the Private Certifier after water board approvals.
6. Upon receipt of the application approval, delivery is advised. The pool manufacture will proceed and the equipment is ordered.
7. Schedule: Day 1 - Excavation of the site; Day 2 - Pool installed and equipment fitted.
8. Hand over point - pool is cleaned, chemically balanced, advise and instruction is provided on how to operate the pool equipment.
9. The pool is given time to settle and then a concrete bond beam is laid. This gives the pool the structural strength.
Tricky Site Installation:
Tricky site? Tranquility Pools have experience in hard to reach backyards.
Floating a Pool - Dora Creek:

An easier option for some water front properties

Pool is lifted by franna and placed in excavated site

Ready to be black filled and plumbed
Floating a Pool - Marks Point:

Pool craned into lake

Jet ski used to transport pool past marina

Ready to be black filled and plumbed
Difficult Access:

Excavator and bobcat lifted over house by crane

Backfill material in skip bin crane lifted over house

Pool crane lifted over house and placed in excavated

Finished pool in place